Medtronic World Headquarters Civil Engineering
Fridley, MinnesotaMedtronic developed a new corporate facility with offices, laboratories, and structured parking on a 46-acre site in Fridley. Inherent challenges with the site included reconfiguration of existing public roads and utilities to create optimum space for the new facilities; correcting unsuitable foundation soils; controlling potential groundwater problems; and obtaining all required land development approvals to meet the prompt project schedule. In addition to the typical site work construction documents, civil engineering services included:
